Skip to content
Royal Style HouseTextile Calculator Hub

Learning & Training

Learn textile calculations the way real companies use them

For students and new merchandisers: every lesson explains who does it in a company, the formula, a worked example with real numbers, common mistakes and a quick quiz — then you try it live in the calculator.

17 lessons 5 tracks Quiz in every lesson Free

Your progress

0%

0 / 17 lessons

  • Fabric basics0/5
  • Garment costing0/4
  • Production & IE0/3
  • Yarn0/2
  • Export & merchandising0/3

Quizzes passed: 0 · Saved on this device

Learning tracks

Garment costing

4 lessons

CMT from SMV, trims BOM, the full cost sheet to FOB, margin vs markup and commission.

  1. CMT cost from SMV and cost per minute 8m
  2. Trims costing with a BOM 6m
  3. The garment cost sheet → FOB price 10m
  4. Margin vs markup, and commission 6m

Production & IE

3 lessons

SMV, line efficiency, capacity and manpower — how factories plan output.

  1. SMV — the standard minute value 7m
  2. Line efficiency 5m
  3. Capacity and manpower planning 7m

Yarn

2 lessons

Count systems (Ne, Nm, Tex, Denier) and yarn needed for a knit order.

  1. Yarn count systems: Ne, Nm, Tex, Denier 6m
  2. Yarn needed for a knit order 6m

Export & merchandising

3 lessons

Incoterms, FOB to CIF, freight in CBM and the real profit on an export order.

  1. Incoterms: EXW, FOB, CFR, CIF and landed cost 9m
  2. Freight: CBM, cartons and containers 6m
  3. Real profit on an export order 8m

How an export order moves through a company

The Time & Action (T&A) flow every merchandiser follows — and where each calculation in this course is used.

  1. 1

    Enquiry & tech pack

    Merchandiser

    Buyer sends the style, tech pack, target price and quantity.

  2. 2

    Costing & quotation

    Merchandiser / costing

    Consumption, cost sheet, CMT and FOB — the numbers in this course.

  3. 3

    Proto / fit sample

    Sampling

    First sample to check fit and design; comments come back from the buyer.

  4. 4

    Order confirmation (PO)

    Merchandiser

    Buyer issues the purchase order with price, quantity, sizes and ship date.

  5. 5

    T&A calendar

    Merchandiser / PPC

    Time & Action plan: every activity with a target date working back from shipment.

  6. 6

    Fabric & trims booking

    Sourcing

    Book fabric (consumption × qty + wastage) and trims from the BOM; lab dips and strike-offs approved.

  7. 7

    PP sample & PP meeting

    Merchandiser / QA / production

    Pre-production sample in actual fabric and trims; everyone agrees the details before bulk.

  8. 8

    Cutting & sewing

    Production / IE

    Markers, lay, cutting, line set-up with SMV and targets; daily efficiency tracked.

  9. 9

    Washing, finishing & packing

    Finishing / QA

    Wash, press, inline and end-line checks, packing as per the buyer's packing list.

  10. 10

    Final inspection

    QA / buyer's QC

    AQL inspection by the buyer or third party before shipment.

  11. 11

    Shipment & documents

    Shipping / documentation

    Invoice, packing list, shipping bill, bill of lading; goods handed over as per the Incoterm.

  12. 12

    Payment & incentives

    Accounts

    Payment realisation through the bank; export incentives claimed.

Jobs in a garment company — and what to learn for each

Merchandiser

The link between buyer and factory — costing, samples, T&A, follow-up until shipment.

Industrial engineer (IE)

Time studies, SMV, line balancing, efficiency and capacity.

CAD / cutting master

Markers, lay planning and cutting-room wastage.

Shipping & export documentation

Bookings, CBM, containers, invoices and shipping documents.

Interview questions

+How do you calculate fabric consumption for a shirt?

From the marker: marker length ÷ garments in the marker, then add cutting wastage and an allowance. Without a marker, use the body/sleeve measurement method and confirm with CAD before booking.

+What is the difference between margin and markup?

Margin is profit as a % of the selling price; markup is profit as a % of cost. For an 18% margin the price is cost ÷ 0.82 — a 21.95% markup.

+How is CMT calculated?

SMV × cost per minute ÷ efficiency gives labour; then add overhead and the factory margin.

+What is SMV and how is it measured?

Standard minute value — observed time from a time study × operator rating, plus PF&D allowances.

+Explain FOB and CIF.

FOB: the seller's responsibility ends when the goods are on board at the loading port. CIF: the seller also pays freight and insurance to the destination port.

+What is a T&A calendar and why is it important?

Time & Action plan listing every activity with dates, worked back from the ship date. It shows delays early so shipments are not missed.

+What is a PP meeting?

Pre-production meeting where merchandising, QA and production review the approved PP sample, comments and risks before bulk cutting.

+How do you check a fabric's GSM?

Cut a 100 cm² disc with a GSM cutter, weigh it, and multiply by 100. Compare with the buyer's tolerance.

+What is marker efficiency and a good value?

Pattern area ÷ marker area. Wovens usually 80–88%; every point of efficiency saves fabric on the whole order.

+How do you calculate CBM for a shipment?

Carton L × W × H in cm ÷ 1,000,000 = CBM per carton, × number of cartons. Compare with container capacity.

+Why is commission calculated as FOB ÷ (1 − rate)?

Commission is a percentage of the final price, so the price must be grossed up; adding the rate on cost leaves you short.

+What is AQL 2.5?

A sampling plan for final inspection: the buyer accepts the lot if major defects in the sample are within the AQL 2.5 limit.

Textile glossary

AQL
Acceptable Quality Level — the sampling standard for final inspection (e.g. AQL 2.5).
BOM
Bill of Materials — every fabric and trim with quantity per garment.
CBM
Cubic metre — the unit for sea freight volume.
CIF
Cost, Insurance & Freight — seller pays freight and insurance to the destination port.
CM / CMT
Cut & Make / Cut, Make & Trim — the factory's charge for making the garment.
CPM
Cost per minute of a sewing line.
Consumption
Fabric needed per garment, usually in metres or yards.
Denier
Grams per 9,000 m of yarn (direct count) — used for filament yarns.
EXW
Ex-Works — buyer collects the goods from the factory.
FOB
Free On Board — seller delivers goods on board at the port of loading.
GLM
Grams per linear metre of fabric = GSM × width (m).
Greige
Unprocessed fabric straight from the loom or knitting machine.
GSM
Grams per square metre — fabric weight.
Hangtag
The branded card attached to a garment, often with price and barcode.
Incoterms
International rules that say who pays for transport, insurance and risk.
Lab dip
A small dyed sample to approve the colour before bulk dyeing.
Lay
Layers (plies) of fabric spread on the cutting table under a marker.
Line balancing
Spreading operations across operators so no one is a bottleneck.
Marker
The plan of pattern pieces laid on the fabric for cutting.
Ne
English cotton count — hanks of 840 yd per pound (higher = finer).
Nm
Metric count — km per kg (higher = finer).
PO
Purchase order from the buyer.
PP sample
Pre-production sample made with bulk fabric and trims.
PPC
Production planning & control.
RoDTEP
Remission of Duties and Taxes on Export Products — an Indian export incentive.
Shade band
Approved range of colour shades for bulk fabric.
Shrinkage
Change in fabric size after washing — allowed for in consumption.
SMV / SAM
Standard minute value / standard allowed minutes for an operation or garment.
Strike-off
Sample of a print to approve colours and placement.
T&A
Time & Action calendar — the schedule of every activity up to shipment.
Tech pack
The buyer's technical file: sketches, measurements, materials and construction.
Tex
Grams per 1,000 m of yarn (direct count).
Trims
Everything except the main fabric — buttons, zippers, labels, thread, tags.
Wastage
Material lost in cutting, processing or handling; added on top of the net requirement.