Skip to content
Royal Style HouseTextile Calculator Hub

Lesson 14 · Yarn

Yarn needed for a knit order

6 min

In a real company

Knit merchandiser, yarn procurement

For knits you buy yarn, not fabric. You work backwards from the garment weight through cutting, dyeing and knitting losses to know how much yarn to book.

Key ideas

  • Finished fabric = garments × garment weight × (1 + cutting wastage%).
  • Greige fabric = finished ÷ (1 − process loss%) — dyeing loses weight.
  • Yarn = greige ÷ (1 − knitting loss%).

Formula

Finished fabric
= Qty × Weight × (1 + Cutting%)
Greige
= Finished ÷ (1 − Process loss%)
Yarn
= Greige ÷ (1 − Knitting loss%)

Worked example

20,000 T-shirts weighing 210 g each. Cutting wastage 8%, dyeing/process loss 10%, knitting loss 2%.

  1. 1Finished = 20,000 × 0.21 × 1.08 = 4,536 kg
  2. 2Greige = 4,536 ÷ 0.90 = 5,040 kg
  3. 3Yarn = 5,040 ÷ 0.98 = 5,142.9 kg

✅ Book about 5,143 kg of yarn.

Try it live in the calculator

Common mistakes

  • Multiplying by (1 + loss%) instead of dividing by (1 − loss%) for process losses.
  • Using the sample garment weight without the size ratio.
  • Forgetting rib / collar fabric.

Quick quiz

Answer 2 of 3 correctly to complete the lesson.

  1. 1. Finished fabric 900 kg, process loss 10%. Greige?

  2. 2. Why divide by (1 − loss%)?

  3. 3. Order: 1,000 pcs × 200 g, no losses. Fabric?