Skip to content
Royal Style HouseTextile Calculator Hub
Garment CostingFree0 using now

CMT Calculator

Cut-make-trim cost per piece from SMV, CPM and efficiency.

  • Runs locally
  • PDF report
  • Mobile ready
Currency
Work content
min
%
pcs/day
hrs/day
Cost
₹/hr
optional
%
optional
%

Live result

Your result will appear here

Enter your values — results update live as you type. Or load a worked example to see how it works.

Complete the inputs to enable PDF, print, save and export.

Your calculations are performed locally in your browser. Nothing you type is uploaded.

Quick answer

What is CMT in garments?

CMT stands for Cut, Make and Trim — the factory's charge for converting buyer-supplied or costed fabric and trims into finished garments.

Cost per minute (CPM) = Operator cost per hour ÷ 60

How it works

CMT Calculator

Price CMT the industrial-engineering way — from SMV, cost per minute and line efficiency — and see the manpower needed to hit your daily target.

A sewing line sells minutes. Cost per minute comes from labour cost; dividing by efficiency gives the real cost of each standard minute produced. Multiply by the garment's SMV and add overhead and margin to get CMT.

Formula

The formula, in full

Cost per minute (CPM)
Operator cost per hour ÷ 60
Effective CPM
CPM ÷ Efficiency%
Labour / piece
SMV × Effective CPM
CMT
Labour × (1 + Overhead%) × (1 + Margin%)
Required operators
Target × SMV ÷ (Hours × 60 × Efficiency%)

Example

Shirt, 22 SMV at 60% efficiency

  1. 01CPM = 85 ÷ 60 = ₹1.417
  2. 02Effective CPM = 1.417 ÷ 0.60 = ₹2.361
  3. 03Labour = 22 × 2.361 = ₹51.94
  4. 04CMT = 51.94 × 1.35 × 1.10 = ₹77.13

Use “Load Example” above to run this example in the calculator.

Industry tip

Industry tip

“Quote CMT on planned efficiency for the style's run length — short runs rarely reach the learning-curve efficiency of a 20,000-piece order.”

Assumptions

What this calculator assumes

  • Operator cost is fully loaded (includes statutory benefits).
  • Overhead is applied on labour; margin on labour + overhead.

FAQ

Frequently asked questions

What is CMT in garments?

CMT stands for Cut, Make and Trim — the factory's charge for converting buyer-supplied or costed fabric and trims into finished garments.

How do I calculate cost per minute?

CPM = total labour cost ÷ total available minutes. For a single operator, hourly cost ÷ 60.

More apps